Industrial & Manufacturing
Renovation of Townsend Park for City of Pittsburgh
City of Pittsburgh
Project Description: Renovation of Townsend Park for the City of Harrisburg
Services: Demolition, concrete, furnishings (benches), earthwork, pavement, playground tile, fencing & landscaping.
Captive Aire
Captive Aire Plant Facility Bedford
156,000 sq. ft.
Project Description: Design and Construct and new fabrication plant expansion
Phase 1: Construct and fit out of existing 72,000 sq. ft. structure.
Work included concrete foundations, slabs, overhead doors, interior offices, HVAC, plumbing, electrical, fire suppression system, dock equipment, site work, asphalt paving and landscaping
Phase 2: Construct an 84,000 sf. ft. building addition
Work included concrete foundations, slabs, overhead doors, interior offices, HVAC, plumbing, electrical, fire suppression system, dock equipment, site work, asphalt paving and landscaping
Huntingdon Penn DOT Facility
Huntington Penn DOT Facility
Project Description: Construction of a 4.8-acre new stockpile site
Work included site work, stormwater basins, staging building, two salt storage buildings, a 5,000-gallon
salt brine storage and containment system, paving, fence & gates.
PA Turnpike Newville Salt Storage
PA Turnpike Commission Newville Salt Storage Building
20,008 sq. ft.
Project Description: Design Build of new dry salt storage building
Work Included glulam beams, translucent siding panels, roofing, cast in place concrete walls, asphalt paving and electrical work
Central Hydraulics Building Expansion
Central Hydraulics Building Expansion
33,844 sq. ft.
Project Description: Construct a new addition to the Central Hydraulics Building
Work included site work, concrete, masonry, structural steel, metal building system, thermal insulation, man doors, overhead doors, light gauge metal framing, drywall, custom casework, signage, dock equipment, elevator, bridge crane, JIB cranes, electrical, asphalt paving and landscaping.
HVAC
Keystone Building Dry Cooler
Project description: Installed two dry coolers on an existing chiller system located in the parking garage and piped into the existing chiller condenser piping. Isolation valves were installed to be able to switch from city water to the glycol system. Glycol feeder and circulating pump were installed in the mechanical room. New electrical circuits were installed to feed the two dry coolers as well as the glycol feeder and circulating pump.
PA Turnpike Somerset Maintenance Facility
PA Turnpike Somerset Maintenance Facility
Project Description: Construction of the new Somerset Maintenance Facility
a. Building No. 1 to house the Section Maintenance 26,114 SF
b. Building No. 2 to house a truck and equipment storage garage 25,935 SF
c. Building No. 4 to house domestic booster pump, fire pump, and an adjacent water storage tank
1007 SF
d. Building No. 5 to house the Pennsylvania State Police Barracks 13,750 SF
e. Building No. 6 a three-sided storage shed, which is unheated and open to the air 1,800 SF
f. Building No. 7 a storage building for the Pennsylvania State Police
g. Building No. 8 includes temporary offices and secure storage for the Pennsylvania State Police
h. Building No. 9 a weather canopy for the fueling station. 1,467 SF
In addition to the construction of the 9 buildings, the work includes site improvements including, but not limited to, demo and removal of existing buildings structures and utilities. Removal of existing underground fuel storage tanks and disposal. Grading and compaction of entire site. Installation of concrete pavement and asphalt pavement. Installation of all site utilities, fencing, landscaping, etc., and an above grade fuel storage tank system and dispensing.
Somerset Penn DOT Facility
PA Department of Transportation New Stockpile Facility Somerset County
Project Description: Construction of a new stockpile facility of PA Department of Transportation
Construction of 4,800 sf salt storage building
Construction of new 1,728 sf aggregate storage building
Construction of new 1,728 sf salt brine storage building along with brine tanks
Construction of new 600 sf tool storage building
Construction of new 1,080 sf personnel staging building
In addition to the construction of the 5 buildings the work also included site work including erosion and sediment control, clearing and grubbing of the site. Installation of all site utilities including stormwater management. Installation of asphalt paving, line striping, stone staging areas, concrete aprons, pads and curbs. Installation of perimeter fencing and gates, final grading and landscaping.
PA Turnpike Commission Everett Fares Building
PA Turnpike Commission Everett Fares Building
16,340 sq. ft.
Project Description: Construction of New Fares Collection/Office Warehouse Building
Work included excavation, stormwater piping, concrete foundations and slabs, brick masonry, metal building system , structural steel framing, thermal insulation, steel and aluminum doors, drywall, acoustical ceilings, flooring, custom casework, painting, HVAC, plumbing, electrical, fire suppression system, mechanical controls, on site generator, paving and landscaping.
This project was Leed Silver Certified.
Bedford Airport Hangar
Contract Date: March, 2011
Completion Date: August, 2011
Project Specs: Construction of a new 10,000 sqft. airplane hangar
Work completed:
Design, site survey, project management, site layout, earthwork, erosion & sedimentation control, site utilities, asphalt paving, concrete, masonry, structural framing, cold-formed metal framing, thermal & moisture protection, doors and windows, sectional doors, drywall, acoustical ceilings, interior and exterior painting, high-performance coatings, specialties, plumbing, sprinkler, HVAC and electrical communications, electronic safety & security system